September 28, 2009

The architect is supposed to be here on 9/29 to meet with the contractor. Apparently the foundation of the existing house is different than it was drawn on the plan. Shocking considering the caliber of the architect. Sounds like the contractors are expecting the architect to suggest underpinnings every 4 feet or so.