February 17, 2012

Insulation inserted between the the sleepers on the floor.
Inspector scheduled to be here Friday to inspect. If he's here early enough they'll get started on the installing the plywood for the subfloor.

Facia installed on the east side of the house.

Roof installed today. Not an exact match to the existing roof - but oh well. Who will know?

Siding stacked up in the back. The contractor decided, with my OK and at his cost, to install wood planking vs. Hardie Planking which is a composite.