November 16, 2009

Last Friday:
All windows installed except for the kitchen replacement and the bathroom.

Today:
Asphalt paper rolled out on roof;
Bathroom windows installed;
Kitchen window installed;
And probably a million other things that I can't even begin to guess at.

Got a call from Home Depot that the French doors are in and ready for pick-up.



What's left of the exterior bathroom wall after the dry rot ran its course. No sheet rock left. Rich will frame it back up correctly and at some later point (years) we'll have to tear it out from the inside and replace it completely.


Getting ready for the bath tub.